Cabins and Farms / Pick all three that fit
Build your own cabin or farm system
Enter your daily use, how many cloudy days to ride through, and your biggest load. The calculator sizes a 48 V system.
What matters
- Well pumps and shop tools set the peak load; check their nameplates.
- Two or three days of battery is a common starting point for cabins; farms with livestock water need more.
Watch out for
- These are planning numbers from our stated rules of thumb. A licensed electrician designs and permits the real system.
Keep going
- Cabin batteries
- Off-grid inverters
- Solar Panels for cabins and farms
- Battery for cabins and farms
- Inverters for cabins and farms
Sources
- EG4 6000XP 48V 6kW off-grid all-in-one inverter/charger, Current Connected (EG4 dealer listing), read 2026-11-10
- EG4 6000XP user manual, EG4 Electronics (manual copy), read 2026-11-10